Direct answer: The All-O-Matic AC slide manual says the electronic reversing devices should be tested and adjusted if necessary every six months.
That six-month instruction is for the AC-board system covered by that manual. Follow the current manual for your exact operator if you have a different generation or control board.
Testing an obstruction-reversing system is safety maintenance. Do not wait for a gate-strike problem to discover that it is not responding correctly.
Source: Official manual.